Under constructionIndustrial building and paint shop, from design to erection
Two steel industrial buildings: a production building and a paint shop. BIM TEAM Engineering produced the detailed structural design and the detailing. The steelwork is imported from China, so the specification was converted from the European standard to an equivalent Chinese one. BIM TEAM Projects is carrying out the work on site, including erection and the installation of panels and cladding. Construction is under way in 2026.